Zum Inhalt springen
Project capital

Acquisition and bridge financing: lock in the plot before the equity is in place (2026)

By Samuel Obermeier·Updated August 2026·7 min read·Project capital
01

The deal is there, the capital is not yet

A plot that fits. A seller who wants to move fast. A notary date in four weeks, and a bank financing that takes three months. This constellation is the classic use case for bridge financing: a short-term pre-financing or interim financing that spans the period between the obligation to pay and the final financing 15.

The reflex of many developers is to let the deal go. That is sometimes right, and sometimes the most expensive decision of the year. Which of the two situations applies can be calculated.

02

What a bridge is, and what it is not

A bridge is short-term, bullet-repayment and expensive. Terms are typically three to twelve months 7. It is replaced as soon as the final financing is ready to be drawn down 5. It is therefore no substitute for missing creditworthiness or missing equity, but an instrument against a timing gap.

03

The three situations in which it makes sense

  1. Acquisition under time pressure. A bidding process or short notary date for which the regular financing cannot keep pace in time 1.
  2. Bridging until drawdown. The bank financing is committed but not yet ready to be drawn down: the purest and least problematic case 1.
  3. Locking in a plot before building rights. The plot is to be locked in before the development plan or permit is in place 1. Here the exit is the most uncertain, and this is the case that goes wrong most often.

The order is deliberate: from top to bottom, the certainty of the repayment route falls, and that is exactly what decides whether a bridge is smart or dangerous.

04

What it costs

Because of the speed and short term, the interest rate is clearly above classic bank financing 1. Market overviews cite orders of magnitude of up to around three percent per month 7, but the range is considerable and depends on collateral, term and certainty of the exit. There are no reliable averages, because every bridge is negotiated individually.

3–12 months
Typical term of bridge financing. It is repaid as a bullet once the final financing is ready to be drawn down, which makes the term the actual risk variable.
Market overview of bridge financing [7][5]

Calculated against the project, a bridge is nevertheless often cheap if it locks in a purchase opportunity or a timetable 1. The benchmark is never the bank interest rate, but the alternative: no plot, no project, no margin.

05

The point at which bridges become dangerous

A bridge has exactly one critical variable: the repayment route. As long as the final financing is committed, the instrument is unspectacular. Once it is only expected, the bridge turns into a deadline, and deadlines under time pressure are the most expensive state in any capital negotiation.

  • One exit is not enough. Besides the planned final financing, a second route needs to be worked through: sale, partial sale or extension on terms agreed in advance.
  • Settle the extension beforehand. What an extension costs belongs in the term sheet, not in the negotiation in the last month.
  • Building rights are not an exit. When locking in a plot before building rights, the repayment route depends on an authority’s decision. That is not a timetable, that is a hope.
  • Unit sales take longer than thought. Anyone who wants to repay the bridge from sales proceeds should know the real timeframes; they are set out in the article on marketing duration.
06

Process and time required

The process is leaner than with a bank financing, but not arbitrarily fast. The usual steps are initial assessment, compiling documents, approaching suitable capital providers, term sheet and drawdown, often within two to six weeks if the documents are complete 1.

07

What you need to have ready

DocumentWhat it is needed forCommon stumbling block
Property documentsValuation and collateralincomplete or outdated
Land register extractRanking position and encumbranceslegacy encumbrances or rights of way overlooked
Purchase contract or draftObligation to pay and datesnotary date is fixed, draft is not
Proof of own fundsDeveloper’s sharefunds are tied up, not available
Exit evidenceRepayment routefinal financing only “in prospect”
TimetableTerm sizingcalculated too tightly, no reserve
Scroll table sideways
08

The honest calculation: bridge against no project

Let us work through the case in which a bridge is actually the right decision. The assumptions are stated openly.

It is exactly this second half of the calculation that decides. A bridge is affordable as long as it ends as planned. It becomes ruinous if it has to be extended, which is why the extension condition belongs in the first conversation and not the last.

The right question is therefore not: what does the bridge cost? But: how certain is the route to repay it, and what does the second route cost me if the first fails? Anyone who can answer both makes a decision; anyone who only compares the interest rate buys a deadline. We examine exactly that before we approach capital providers: mezzanine and bridge capital for project developers. Which other instruments come into question is shown in the decision guide.

Frequently asked questions

Sources

  1. [1]Alternate Capital: Bridge financing real estate: use cases and process https://www.alternate-immobilien.de/bridge-finanzierung-immobilien
  2. [2]Alternate Capital: Bridge loan real estate https://www.alternate-immobilien.de/bridge-loan-immobilien
  3. [3]Alternate Capital: Bridge financing in Germany, Austria and Switzerland https://www.alternate-immobilien.de/bridge-financing
  4. [4]Optimumhyp: Bridge financing and interim financing for commercial borrowers https://www.optimumhyp.de/zwischenfinanzierung-nur-fuer-gewerbliche-kreditnehmer/
  5. [5]FINANCE RE: Real estate bridge financing https://finance-re.de/immobilienfinanzierung/immobilien-bridge-finanzierung/
  6. [6]Amoreal Finance: Bridge financing https://amoreal.de/bridge-finanzierung/
  7. [7]finanzierung.com: Bridge financing: terms and conditions https://finanzierung.com/finanzierungsalternativen/brueckenfinanzierung/
  8. [8]EBA: Final Guidelines on ADC exposures, applicable from 04.11.2025 https://www.eba.europa.eu/publications-and-media/press-releases/eba-publishes-its-final-guidelines-acquisition-development-and-construction-exposures-residential
  9. [9]Konii: BF.Quartalsbarometer Q2 2026 with margins by type of use https://www.konii.de/news/bf-quartalsbarometer-q2-2026-stimmung-unter-den-immobilienfinanzierern-bricht-ein/
  10. [10]Alternate Capital: Mezzanine capital interest rate 2025 and 2026 https://www.alternate-immobilien.de/mezzanine-kapital-zinssatz
SO
Samuel ObermeierObermeier Capital, Munich

Procures, on mandate, creditworthiness-checked buyers for residential units, properties for family offices and funds, and mezzanine capital for project developers.

More about Samuel Obermeier
Channels

First check the exit. Then the bridge.

We first check whether the repayment route holds, and both of them, and only then approach capital providers. The mandate is fee-based before we start.

Submit a project