Where the gap comes from

The lending ratio for project financings is stated as loan-to-cost, the ratio of loan to total cost. Depending on the type and risk of the project, it lies between 0.6 and 0.9 1. This figure directly determines how much equity you have to provide: at an LTC of 0.65, it is 35 percent of total cost.

This range is the real finding. Between 0.6 and 0.9, on ten million euros of total cost, lies a difference of three million euros in equity, and which value applies is decided not by your negotiating skill but by the risk profile the bank assigns to the project.

0.6–0.9
Range of loan-to-cost in project financings, depending on the type and risk of the project. This results in an equity requirement of between ten and forty percent of total cost.
Market overview of developer financing [1][2]
02

Why the gap will not shrink in 2026

The requirement is not a negotiation outcome but, to a large extent, regulation. Under the EBA guidelines on ADC exposures, applicable since 4 November 2025, project development loans generally carry a risk weight of 150 percent. It falls to 100 percent only if there is at least 50 percent pre-sales or pre-letting and at least 25 percent equity from the developer 56.

In Austria there is an additional tightening: capital requirements for banks rise there in stages to 2.0 percent from July 2026 and 3.5 percent from July 2027. The consequence is less room for lending, stronger selection of projects, rising financing costs for developers and falling credit availability 3.

03

Five routes to close the gap

  1. Mezzanine capital. Through a qualified Rangrücktritt (subordination), the bank largely counts it as economic equity. Nominal cost eight to seventeen percent, effectively often considerably more.
  2. Whole loan from a debt fund. Senior and subordinated from one source: one counterpart instead of two negotiations. More expensive than the bank, but feasible when the bank does not take part at all.
  3. Joint venture equity. Real equity from a family office or institutional investor, paid for with a profit share instead of interest, and usually with the expectation that you invest noticeably alongside.
  4. Seller loan. The plot seller defers part of the purchase price. It costs negotiation instead of interest, but only works with a suitable starting position.
  5. Contribution of the plot. A plot that is already paid for or was acquired cheaply acts like equity, provided the bank accepts the valuation.
04

The sixth route that almost nobody calculates

All five routes raise capital. But there is a sixth that lowers the requirement itself: the pre-sales ratio. Anyone who reaches the 50 percent threshold and at the same time provides 25 percent equity brings the risk weight from 150 to 100 percent 5, and thereby changes the calculation the bank makes before expensive subordinated capital is even discussed.

50 % / 25 %
Pre-sales ratio and equity share from which the risk weight for project development loans falls from 150 to 100 percent. Both conditions must be met together.
EBA guidelines, applicable since 4 Nov. 2025 [5]

In practice this means: every additional notarised purchase contract before the financing commitment is worth real money. That is exactly why unit sales and capital raising belong together; why buyers fail on financing is covered in the article on the six knock-out criteria of banks.

05

What each route costs

RoutePriceWhen it makes senseDrawback
Mezzanine8–17 % nominal, effectively higherlast 10–20 percentage points missingexpensive, subordinated, additional costs
Whole loansenior margin plus a clear premiumbank exits entirelyone dependency instead of two
JV equityprofit sharelarge project, strong partner wantedyou give up control
Seller loannegotiation, often low interestseller has an interest in the deal happeningrarely available
Contribution of the plotno direct costsplot already locked inbank must accept the valuation
Raise pre-salessales effortbefore the financing commitmenttakes time and buyers who can obtain financing
Scroll table sideways
06

The honest calculation: two routes, one project

Let us work it through on a project. The assumptions are stated openly; in particular, the bank’s reaction to a higher pre-sales ratio is an assumption, not an automatism.

Worked exampleWhere the equity gap arises
Financing of total cost
10,000,000 EUR
Total cost of the project
10,000,000 EUR
  • Bank loan at an LTC of 0.656,500,000 EUR
  • Existing equity2,000,000 EUR
  • Open gap1,500,000 EUR
  • Total cost of the project10,000,000 EUR

At an LTC of 0.65, the bank finances 6.5 million. EUR 3.5 million of equity is needed, two are available: EUR 1.5 million is missing. Mezzanine for this costs around EUR 510,000 over twenty-four months. All values are assumed.

Own illustration, assumptions disclosed in the text · Obermeier Capital

The comparison shows why the sequence decides the price. Anyone who looks for capital first and sells afterwards pays for the full gap. Anyone who sells first and looks for capital afterwards negotiates over a smaller gap on better terms.

07

The three most common mistakes

  1. The gap is recognised too late. Anyone who only calculates after the bank’s rejection negotiates under time pressure, and time pressure is the most expensive item in any capital negotiation.
  2. Only the nominal interest rate is compared. Structuring fee and equity kicker raise the actual cost considerably, as the article on the total cost of mezzanine shows.
  3. Pre-sales is treated as a sales topic. It is a financing topic. Every percentage point before the commitment changes the terms of the entire project.

The right question is therefore not: where do I get the missing EUR 1.5 million from? But: how big is the gap really if I work on pre-sales and structure beforehand, and what does each month of waiting cost me? We examine exactly that first and only raise capital afterwards: mezzanine capital for project developers.

Frequently asked questions

Sources

  1. [1]StartingUp: Developer financing: LTC and equity ratio https://www.starting-up.de/geld/finanzplanung/bautraegerfinanzierung.html
  2. [2]GenoAkademie: Developer financing https://www.genoakademie.de/genossenschaftsbanken-finanzdienstleister/produktion/marktfolge-aktiv-firmenkunden/fk610103/
  3. [3]Immobilien-Redaktion: Infina warns: new capital buffer slows developer financing from 2026 (Austria) https://immobilien-redaktion.com/artikel/infina-warnt-neuer-kapitalpuffer-bremst-bautragerfinanzierung-ab-2026
  4. [4]Reval: Equity in the developer business https://www.reval.co.at/blog/post/eigenkapital-im-bautragergeschaft
  5. [5]EBA: Final Guidelines on ADC exposures, applicable from 04.11.2025 https://www.eba.europa.eu/publications-and-media/press-releases/eba-publishes-its-final-guidelines-acquisition-development-and-construction-exposures-residential
  6. [6]Deloitte: Implementation of Basel III / CRR III in the EU (2025) https://www.deloitte.com/de/de/Industries/financial-services/perspectives/umsetzung-basel-iii-in-eu.html
  7. [7]Konii: BF.Quartalsbarometer Q2 2026 with margins by type of use https://www.konii.de/news/bf-quartalsbarometer-q2-2026-stimmung-unter-den-immobilienfinanzierern-bricht-ein/
  8. [8]BF.direkt: BF.Quartalsbarometer real estate financing https://www.bf-direkt.de/bf-quartalsbarometer/
  9. [9]Alternate Capital: Mezzanine capital interest rate 2025 and 2026 https://www.alternate-immobilien.de/mezzanine-kapital-zinssatz
  10. [10]CBRE: Real estate investment market grew in the first half of the year (H1 2026) https://www.cbre.de/press-releases/immobilieninvestmentmarkt-legte-im-ersten-halbjahr-zu
SO
Samuel ObermeierObermeier Capital, Munich

Procures, on mandate, creditworthiness-checked buyers for residential units, properties for family offices and funds, and mezzanine capital for project developers.

More about Samuel Obermeier
Channels

First shrink the gap. Then finance.

We first review the calculation, structure and pre-sales status, and only then raise capital, once the gap is as small as it can be. The mandate is fee-based before we start.

Submit a project
Work it out yourself

How big is your equity gap?

Total investment cost, bank loan and existing equity give the amount you are missing, and the loan-to-cost your bank will see.